FOR INVESTORS

The facility is yours. Running it is ours.

Most GPU data center investment means buying a slice of someone else’s balance sheet. This is the other kind. You finance and own the physical edge facility outright. SovereignOne specifies it, builds it, commissions it, and then operates it for you under contract. The asset sits on your books. The pager sits with us.

The capacity is spoken for before it is built

1.4%
Vacancy across North America’s primary data center markets, H1 2026 — a record low
80.4%
Of capacity under construction already committed before delivery
7,481 MW
Under construction, itself a record, and up 24.8% in the half

Those are CBRE’s figures for the first half of 2026. Read them as an investor rather than as an operator: new supply is not competing for tenants, it is being spoken for while it is still a drawing.

CBRE’s own conclusion is that power availability and infrastructure delivery timelines remain the most decisive factors in where capacity lands, and that local approval has become as critical to site selection as power and fiber.

So the scarce asset is not the GPU. It is an energised site, with local approval, finished inside a window that still matters to the tenant. That is what a GPU data center investment is really buying.

What a GPU data center investment actually buys

A SovereignOne facility is a finished modular data center delivered to your site — not a construction project you supervise. It arrives built, wired, cooled and tested. Five lengths, one density:

LengthRacksCapacity
7 ft1125 kW
12 ft2250 kW
20 ft5625 kW
40 ft101.25 MW
52 ft141.75 MW

Capacities are nominal per unit at 125 kW per rack.

Units combine, so a site grows by adding modules rather than by rebuilding. A pad that starts with one 40-foot unit can carry several without a redesign.

Cooling is specified per deployment rather than fixed by the shell: direct-to-chip liquid, rear-door heat exchangers, immersion, or JouleForce molecular beam cooling from Forced Physics. What the tenant’s hardware needs decides it.

How a facility comes together

Step 01

Site and power

You bring the site, or we assess candidates against the three things that actually decide it: available power, a ground path, and local approval. Most failed sites fail here, before anything is ordered.

Step 02

Sizing against the offtake

Configuration follows the tenant. Rack count, density and cooling method are set by what will run in the unit, not by a catalogue tier you pick from.

Step 03

Build and factory test

The unit is built and commissioned off site while your site works — pad, utility tie-in, fibre — proceed in parallel. That parallelism is where the schedule comes from.

Step 04

Delivery and energisation

Total time is four to six months, against two to five years for a conventional build.

What we carry after it is live

Ownership without an operator is a liability, not an asset. The operations agreement is what turns a GPU data center investment into a turnkey one rather than a box on a pad.

  • Monitoring, alerting and remote hands.
  • Preventive maintenance on the cooling and power plant.
  • Density and capacity changes as tenants change.
  • Compliance scoped to your facility. SOC 2 and ISO 27001 are handled per deployment rather than inherited from a product certificate, and units can be certified for HIPAA.
  • Reporting in a form you can hand to a lender or a tenant.

Three numbers to ask for before you commit

Per-megawatt benchmarks are built for hyperscale and they mislead badly below a megawatt, where a large share of the cost stops scaling with capacity. Before committing to a GPU data center investment, ask instead for:

  1. The delivered cost of the unit, with its scope boundary written down.
  2. The site works cost, separately, because it varies more by site than anything else in the quote.
  3. The cost per rack at your configuration — the only figure that makes two unlike proposals comparable.

We work through why each one matters, and where the money hides in a quote, in the Resources library.

Questions from investors.

Who holds title to the equipment?

You do. A GPU data center investment here is an outright purchase: you finance and own the facility, and SovereignOne’s position is the operations agreement, not an interest in the asset.

What happens if we want a different operator later?

The facility is yours, so the operating agreement is a contract you can let run out. The unit is not keyed to us, and the monitoring and access handover is written into the agreement rather than negotiated at the end of it.

Can a facility be moved?

Yes. It is a container, not a building. Relocation means disconnection, transport and re-energisation at the new site — slower than a move-in, far faster than a rebuild. That optionality is part of what you are buying.

What does the investment not cover?

Land, utility upgrades beyond the tie-in, and the tenant’s IT hardware. The rack counts and capacities above describe the facility, not the compute installed in it.

Where can a facility be sited?

Any country, provided no US Government export restriction applies to that deployment.

Tell us about the site.

Send the site, the power you have available, and the offtake you are underwriting. We will tell you which configuration fits, what the site works look like, and what the schedule actually is.

Nothing on this page is an offer of securities, an investment recommendation, or a projection of returns. Capacities shown are nominal equipment specifications.